HDR Headquarters

IMG_6851.jpg

Systems: Plumbing, Hydronic Piping, Heating, Ventilation, Air Conditioning, Insulation, Controls

Size: 250,000 sq ft building with 1 floor of retail and 9 floors of office space.

Systems: Size: 7 story office building with an attached parking garage

Note: HVAC systems utilizes a custom desiccant air handling unit to serve over 900 chilled beams throughout. 3D coordination used throughout the project both in the field and in the fabrication process.

Previous
Previous

Wholestone Farms

Next
Next

NeMed Fred & Pamela Buffett Cancer Center